Nursing home - ITALY Nursing home GEHP SITUATION: San Francesco Institute had to provide heating and cooling usingi the existing water distribution piping. The main aim was to find a system able to ensure CO2 emissions savings and economic savings. SOLUTION: 6 GEHP 20...
Hotel - Greece Ilissos SITUATION: Before Olympic Games the Hotel Ilissos in Athens needed to change its old boiler + chiller system. The main purpose was to provide heating and cooling with a new system exploiting natural gas combustion. The customer opted for a...
Nursing home - HOLLAND Nursing home GEHP SITUATION: The nursing home had to replace the old air conditioning system in compliance with the overall refurbishment of the building. REQUEST: The customer needed a single-phase and silent system able to provide also...
municipality - slovak republic GEHP DESCRIPTION Building of the Municipal Office in Senica is heated by the gas heat pump in bivalency with the district heating station. Heating is performed through the plate heaters. For the purposes of air-conditioning, new cooling...
Car dealer - ITALY Car delaer GEHP GEHP SITUATION: Necessity to instantly provide heating and cooling in the new showroom (2 fllors, 1.000 mq for every floor) avoiding the construction of a new electrical substation. SOLUTION: 5 GEHP 20 HP (315 kW heating – 280...